Rainwater Harvesting Tank Installation – Part 1

Pour Concrete in the Rain Tank Curb Forms

Now it’s a matter of loading the concrete mixer and filling the forms. My little mixer can handle 2 bags at a time.

To save my back I have the bags stacked at the end of my pickup box. I add some water, set the bag over the drum and cut it open to dump it in. Then start the drum spinning before tilting it. When this is mixed I do the same with the second bag.

After a few minutes I rotate the drum over to the other side and dump it in a wheelbarrow.

Shovelling Wet Concrete into Forms

The curb is narrow so I opted to fill the forms by hand with a shovel instead of just pouring the concrete right out of the wheelbarrow. Given the slope and access, I decided I’d spill a fair amount of the wet concrete so, shoveling would take longer but waste less. And this worked well.

Marilyn came to give me hand and that went much faster. We got into a flow and the pour went much faster than I expected. I loaded the mixer and Marilyn filled the forms.

Anchor Bolts

Before the concrete hardened I added some anchor bolts for the post brackets. And covered the fresh concrete with plastic.

Stripping the Forms

After a few days I stripped the forms. And this went well. The outside boards came off without any problems. And the inside ones as well. The curb looked great. I kept it covered with plastic to cure for a while longer.

I’ll be installing a pump in the shed beside the tank so I roughed in a 1 inch water line that drops under the curb and over to the wall of the shed. More on that in Part 3 of this series.

Fill the Rainwater Harvesting Tank base with gravel

I rolled out some drain fabric and shoveled in a layer of crushed road base. Raked this flat and packed it down.

Packing the Gravel

Then I topped up the base surround with 3/8″ pea gravel. It’s a finer round rock that drains well and has no sharp edges that could puncture the tank. The pea gravel does not pack so well so I added some sand to it. And that seemed to help.

Sliding the Tank into place

With the gravel level and packed we slid the tank into place. We used some 2 by fours and a strap around the tank to help with this. It was satisfying to finally get the tank into place.

So I hope you have enjoyed this post, and thank you so much for reading. If I make any further improvements or changes I’ll post them here.

And, while you are here, please hit the Support Link to help us make more projects and videos like this. We really appreciate anything you can do to help us out!

Jump to:
Part 1 – Pour a Rainwater Tank Foundation
Part 2Rainwater Tank Plumbing and Fittings
Part 3Rainwater Tank Pump and Irrigation
Part 4First Run of Tank Drip Irrigation System


Related Posts

  1. MAN about TOOLS - Remove Silt Mud Sediment from a Well

Leave a Comment